We have been on PDMLink for 6 weeks and the performance is killing us.
The servers are in a MS cluster with 2 8-way processors with 16GB in each box. One server runs Oracle and the other runs PDMLink. The data is stored in a NAS array connected to both boxes by fiber.
Our old Intralink system was a single processor with 3GB of memory.
I loaded the same assembly from Intralink in 45 seconds that took PDMLink 3 1/2 minutes. On some of our larger assemblies, we are seeing load times of 30-45 minutes.
Has anyone else seen this sort of performance degradation with PDMLink?
The servers are in a MS cluster with 2 8-way processors with 16GB in each box. One server runs Oracle and the other runs PDMLink. The data is stored in a NAS array connected to both boxes by fiber.
Our old Intralink system was a single processor with 3GB of memory.
I loaded the same assembly from Intralink in 45 seconds that took PDMLink 3 1/2 minutes. On some of our larger assemblies, we are seeing load times of 30-45 minutes.
Has anyone else seen this sort of performance degradation with PDMLink?