MFegenbush
New member
A quick question:
I installed intralink today, and I was wondering... We previously
had a project to build a unit (PN: 13120). Six months later, we
have a project to build the next higher assembly. If I setup my
top folder level as the highest assembly, would I be able to, at a
later date, completely consolidate that folder into another folder
(when it ceases to be the highest level that we work on)?
Thanks,
Matt
I installed intralink today, and I was wondering... We previously
had a project to build a unit (PN: 13120). Six months later, we
have a project to build the next higher assembly. If I setup my
top folder level as the highest assembly, would I be able to, at a
later date, completely consolidate that folder into another folder
(when it ceases to be the highest level that we work on)?
Thanks,
Matt