ashishvats
New member
View attachment 5813
How to give highlighted Datum B in Pro-E because in drawing
its related with draft line.
Is that Datum B is correct as per GD&T?
How to give highlighted Datum B in Pro-E because in drawing
its related with draft line.
Is that Datum B is correct as per GD&T?