Hi, this is my 1st post here. I'm glad to see there're many helpful topics which help me in using PRO/E.
I'm a 2001 user. I have a problem in using GT in a 2D drawing for an assembly.
For instance, I have a.asm which contains b.prt and c.prt. I would like to add a TP for a dimension of c.prt. The TP should refer to the datum "X" fromb.prt.I showdatum "X" of b.prt in the 2D drawing. What should I do next to add a TP on the dimension of c.prt
I'm a 2001 user. I have a problem in using GT in a 2D drawing for an assembly.
For instance, I have a.asm which contains b.prt and c.prt. I would like to add a TP for a dimension of c.prt. The TP should refer to the datum "X" fromb.prt.I showdatum "X" of b.prt in the 2D drawing. What should I do next to add a TP on the dimension of c.prt