Can anyone recommend some best practices on revising a drawing pertaining to:
1. View updates on other other drawings which are affected by the incumbent drawing. Do you normally update them along with the revised drawing? What do you do if 100 drawings, just the views, are affected?
2. Do you bump up the revision of all the other drawings eventhough nothing was done to it, except the fact their drawing views are outdated due to a change of feature or other references?
Thanks in advance.
1. View updates on other other drawings which are affected by the incumbent drawing. Do you normally update them along with the revised drawing? What do you do if 100 drawings, just the views, are affected?
2. Do you bump up the revision of all the other drawings eventhough nothing was done to it, except the fact their drawing views are outdated due to a change of feature or other references?
Thanks in advance.