I'm just starting out in pro-e as an NC programmer. We have 3 different departments:
Engineering: designs the models
Tool design: designs the fixtures and tooling
Programming: programs the part.
At present only engineering has been using PRO-e the rest has been using an older 2d system. Everyone has to start using PRO-E.
Wondering if it would be best if Tool design makes the manufacturing assembly,then the programmers use it?
Any imput would be helpful.
Engineering: designs the models
Tool design: designs the fixtures and tooling
Programming: programs the part.
At present only engineering has been using PRO-e the rest has been using an older 2d system. Everyone has to start using PRO-E.
Wondering if it would be best if Tool design makes the manufacturing assembly,then the programmers use it?
Any imput would be helpful.