Hi All,
In Intralink 3.2, if you changed the revision of a part and drawing with each open in ProE, you could just use the file replace command. Now I am using Intralink 3.4 but I can not find the same command to do this, I have been closing each file and erasing memory, reopen in order to get the &proi_revision to update.
Is there a easier way?
Thanks Jeff Toff
In Intralink 3.2, if you changed the revision of a part and drawing with each open in ProE, you could just use the file replace command. Now I am using Intralink 3.4 but I can not find the same command to do this, I have been closing each file and erasing memory, reopen in order to get the &proi_revision to update.
Is there a easier way?
Thanks Jeff Toff