I am curious ifthere is an easy way to have PDMLink create reports ofcertain actionsand email them on a weekly basis.
I would like to keep track of our library files and monitor who has checked out and checked back into the library. We use an engineer change process that is outside of PDMLink, and I want to make sure that the files that get modified by the engineers are consistent with the engineer changes for that given week.
I am also looking into means of locking files, such as drawing formats, start parts and othercommon filesso that they can only be edited by administrators, and general users cannot modify, change thier revisions, or make a copy of them.
Is there anyway that PDMLink can perform either of these tasks?
Thanks in advance.
I would like to keep track of our library files and monitor who has checked out and checked back into the library. We use an engineer change process that is outside of PDMLink, and I want to make sure that the files that get modified by the engineers are consistent with the engineer changes for that given week.
I am also looking into means of locking files, such as drawing formats, start parts and othercommon filesso that they can only be edited by administrators, and general users cannot modify, change thier revisions, or make a copy of them.
Is there anyway that PDMLink can perform either of these tasks?
Thanks in advance.