backoffice
New member
Hello everybody,
I would like to insert a delay between two manufacturing sequences.
This delay will allow manufacturer to clean the model manually and then persue and continue to the second sequence. (the both seuquence are from same operation).
This delay correspond to G04 in the iso file.
I would like to realize this action before a thread millign sequence.
any idea is welcome.
thanks in advance.
I would like to insert a delay between two manufacturing sequences.
This delay will allow manufacturer to clean the model manually and then persue and continue to the second sequence. (the both seuquence are from same operation).
This delay correspond to G04 in the iso file.
I would like to realize this action before a thread millign sequence.
any idea is welcome.
thanks in advance.