The company I work for has just switched from Pro/E 2001 to Pro/E WF2 and I'm still trying to learn it...
One of the things I use to do quite often in 2001 was to copy tables
from one drawing to another. I use to do this by hitting ctrl+C and
highlighting the table in one drawing and then hitting ctrl-V in the
other drawing to past the table. This doesn't work at all in WF2 and I
have been digging through menus for an hour now trying to figure out
how to do this. Can someone please tell me how to easily copy a table
from one drawing to another?
One of the things I use to do quite often in 2001 was to copy tables
from one drawing to another. I use to do this by hitting ctrl+C and
highlighting the table in one drawing and then hitting ctrl-V in the
other drawing to past the table. This doesn't work at all in WF2 and I
have been digging through menus for an hour now trying to figure out
how to do this. Can someone please tell me how to easily copy a table
from one drawing to another?