I moved components from a subassembly to the top level assembly using the restructure command. I later deleted the restructured components from the top level assembly. But the reference created between the subassembly and the top level assembly is still there. When attempting to check in the subassembly, the top level assembly is also needed.
When I use Workspace Relationship Report on the subassembly the top level assembly does not show. But when I use ProE Info->Relations and Parameters for the subassembly I still find the deleted components. The commentis THIS FEATURE IS CURRENTLY SUPRESSED for these components. I have search for supressed/failed/frozen/restructured out/++ in both assemblies without results.
How can I remove this relation? Is there a config-option similar to "cleanup_drawing_dependencies" for models?
I use WF2 and Intralink 3.4
When I use Workspace Relationship Report on the subassembly the top level assembly does not show. But when I use ProE Info->Relations and Parameters for the subassembly I still find the deleted components. The commentis THIS FEATURE IS CURRENTLY SUPRESSED for these components. I have search for supressed/failed/frozen/restructured out/++ in both assemblies without results.
How can I remove this relation? Is there a config-option similar to "cleanup_drawing_dependencies" for models?
I use WF2 and Intralink 3.4