Hello folks. I was under the impression that the working copy was a way to change or fix a checked in revision without revising the part. We were going to use it if we did a check in then noticed a missing dimension etc before the drawing was released.
However, I am finding that I can not check out a working copy that was checked in by another user. All I can get is the full revision before the working copy.
Am I missing a setting or something? I want to be able to check out a working copy that somebody else has released ownership of, then modify it, and check it back in. Is that impossible with PDM or am I just missing a setting somewhere??
However, I am finding that I can not check out a working copy that was checked in by another user. All I can get is the full revision before the working copy.
Am I missing a setting or something? I want to be able to check out a working copy that somebody else has released ownership of, then modify it, and check it back in. Is that impossible with PDM or am I just missing a setting somewhere??