Changing the Rev Level of an Iteration

msaroff

New member
Background: CM is slow to process ECNs (not a Windchill/PTC function), which means that multiple ECNs can stack up.


As a result of this confusion, some work on an assembly that I did was done to the wrong rev.


The drawing/assembly/gear was in the system at iteration aA.1, and when I checked my changes, the most recent iteration became A.2.


The problem is that the drawing is now rev B.


Obviously, I could use the delete last iteration function, taking the drawing/assembly/geariteration a.1, then release and rev the drawing/assembly/gear to B, but this would entail my having to redo a couple of days of work.


Is there a way for me to either make the A.2 iteration a B.1 iteration, or to release and up the rev to B, and then delete the A.2 iteration?
 