have a problem with a post processed 3 axis milling job. I have a volume milling and profile sequences (a circular pocket), both with build cut approach and exit moves.
The problem is that i get the approach move XYZ in one block when it should be one block for XY and then Z.
I get:
N16 T2
N17 M6
N18 G40
N19 S1200 M3
N20 G0 G43 Z40
N21 Z5
N22 G1 X50 Y50 Z-10 F120
N23 X48
...
it should be:
N16 T2
N17 M6
N18 G40
N19 S1200 M3
N20 G0 X50 Y50
N21 G43 Z50
N21 Z5
N22 G1 Z-10 F120
N23 X48
With gpost, the post is setup to separate movements:
View attachment 5633
I think we have not experienced this problem with previous versions of Proe.We are running Creo 1.0.
Any help?
The problem is that i get the approach move XYZ in one block when it should be one block for XY and then Z.
I get:
N16 T2
N17 M6
N18 G40
N19 S1200 M3
N20 G0 G43 Z40
N21 Z5
N22 G1 X50 Y50 Z-10 F120
N23 X48
...
it should be:
N16 T2
N17 M6
N18 G40
N19 S1200 M3
N20 G0 X50 Y50
N21 G43 Z50
N21 Z5
N22 G1 Z-10 F120
N23 X48
With gpost, the post is setup to separate movements:
View attachment 5633
I think we have not experienced this problem with previous versions of Proe.We are running Creo 1.0.
Any help?