I am about to upgrade proE and intralink to later releases and I face the task of verifying the installation before rolling it out to the users. For this I have started working on a control plan with checkpoints, i.e. "Check out object", "create new part using proe", "check in new part","promote new part" and so on.
I was wondering if anyone has such a controlplan already and would like to share?
I am about to go to ilink 3.4 (later datecode) and wildfire 3 (from wf2)
I was wondering if anyone has such a controlplan already and would like to share?
I am about to go to ilink 3.4 (later datecode) and wildfire 3 (from wf2)