We're using Wildfire 3 with Intralink 3.4.
In our 4-person department, we all have different ways of adding/updating model and drawing parameters. Some enter directly into Pro/E parameters, some directly into Intralink (parameters are designated), and some change the drawing BOM. The third one is successful only part of the time - the changes are not always updated in the model or Intralink. The BOM table always appears to still have associativity. Is there a sequence that must be followed to ensure that drawing BOM changes update the part and Intralink data?
In our 4-person department, we all have different ways of adding/updating model and drawing parameters. Some enter directly into Pro/E parameters, some directly into Intralink (parameters are designated), and some change the drawing BOM. The third one is successful only part of the time - the changes are not always updated in the model or Intralink. The BOM table always appears to still have associativity. Is there a sequence that must be followed to ensure that drawing BOM changes update the part and Intralink data?