jogars1965
New member
I am a mold designer designing average to complex single cavity, 2~4 slides diecast mold for 135~350ton machine. my mold design covers splitting, core/mold design, mold assembly, electrode design, cavity and electrode toolpathing, and mfg drawings all in ProE. With the advent of new technologies what is the acceptable design lead time for this process, and what is the acceptable mold manufacturing lead time now adays? Can anybody give me some ideas.