I know I asked this question about a year ago, but I will open it again.
We are in the process of moving away from Intalink 8.0 and Wildfire 3.0 to Solidworks 2011. I need to export or move about 7000 files out of the intralink database. Has anyone looked at this, tried this or have any idea's about it. I know I can pull up files in Proengieer and save as a zip file to the local drive, but that is a slow and exspensive process.
I am a long time ProEngineer user, way back when you had to use command lines an run on a dedicated workstation, so I don't want to turn this into PTC bashing. I have built a good career around working with PTC products but as with everything in life things change.
We are in the process of moving away from Intalink 8.0 and Wildfire 3.0 to Solidworks 2011. I need to export or move about 7000 files out of the intralink database. Has anyone looked at this, tried this or have any idea's about it. I know I can pull up files in Proengieer and save as a zip file to the local drive, but that is a slow and exspensive process.
I am a long time ProEngineer user, way back when you had to use command lines an run on a dedicated workstation, so I don't want to turn this into PTC bashing. I have built a good career around working with PTC products but as with everything in life things change.